Nuclear Regulatory Commission Issuances: Opinions and Decisions of the Nuclear Regulatory Commission with Selected Orders, Volume 4; Volume 88

Front Cover
United States Nuclear Regulatory Commission, 1976 - Nuclear energy
 

Other editions - View all

Common terms and phrases

Popular passages

Page 311 - research and development" means (1) theoretical analysis, exploration, or experimentation; or (2) the extension of investigative findings and theories of a scientific or technical nature into practical application for experimental and demonstration purposes, including the experimental production and testing of models, devices, equipment, materials, and processes. (y) The term "Restricted Data...
Page 616 - ... petitioner's interest will be represented by existing parties; (6) the extent to which petitioner's participation may reasonably be expected to assist in the development of a sound record; and (7) the extent to which participation of the petitioner will broaden the issue or delay the proceeding.
Page 117 - ... arguably within the zone of interests to be protected or regulated by the statute or constitutional guarantee in question.
Page 60 - ... reasonable assurance that the facility will be completed, in conformity with the construction permit and the application as amended, the provisions of the Act, and the rules and regulations of the Commission; and (2) There is reasonable assurance (i) that the activities authorized by the provisional operating- license can be conducted without endangering the health and safety of the public...
Page 573 - Nontimely filings will not be entertained absent a determination by the Commission, the presiding officer or the atomic safety and licensing board designated to rule on the petition and/or request...
Page 22 - ... (5) the extent to which petitioner's interest will be represented by existing parties...
Page 360 - ... fullest" possible extent would seem to demand that environmental issues be considered at every important stage in the decision making process concerning a particular action — at every stage where an overall balancing of environmental and nonenvironmental factors is appropriate and where alterations might be made in the proposed action to minimize environmental costs.
Page 337 - On the basis of the foregoing, there is reasonable assurance that (i) such safety questions will be satisfactorily resolved at or before the latest date stated in the application for completion of construction of the proposed facilities, and (ii) taking into consideration the site criteria contained in 10 CFR Part 100.
Page 648 - It is that earthquake which produces the maximum vibratory ground motion for which certain structures, systems, and components are designed to remain functional. These structures, systems, and components are those necessary to assure: (1) The integrity of the reactor coolant pressure boundary, (2) The capability to shut down the reactor and maintain it in a safe shutdown condition, or (3) The capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures...
Page 337 - In any event, no license may be issued to any person within the United States if, in the opinion of the Commission, the issuance of a license to such person would be inimical to the common defense and security or to the health and safety of the public.

Bibliographic information