... general conditions contain legal ground rules that are consistent from project to project . They deal with ... ( AIA ) , the Engineers Joint Contract Documents Committee ( EJCDC ) , the Associated General Contractors of America ( AGC ) ...
... general conditions contain legal ground rules that are consistent from project to project . They deal with ... ( AIA ) , the Engineers Joint Contract Documents Committee ( EJCDC ) , the Associated General Contractors of America ( AGC ) ...
Page 3-6
... general conditions of the contract to fit these specific requirements of a project . RIGHTS AND OBLIGATIONS OF THE ... AIA General Con- ditions require an owner , upon request , to provide evidence that money is actually available to do ...
... general conditions of the contract to fit these specific requirements of a project . RIGHTS AND OBLIGATIONS OF THE ... AIA General Con- ditions require an owner , upon request , to provide evidence that money is actually available to do ...
Page 3-7
... General Conditions require a general contractor to bind all sub- contractors to the same terms and conditions that ... AIA General Conditions makes claims involving separate con- tractors subject to the claims procedure in A201 . Other ...
... General Conditions require a general contractor to bind all sub- contractors to the same terms and conditions that ... AIA General Conditions makes claims involving separate con- tractors subject to the claims procedure in A201 . Other ...
Contents
LESSON TWO DOCUMENTATION | 2-1 |
Introduction | 3-1 |
pages 41 to 419 | 4-4 |
Copyright | |
1 other sections not shown
Common terms and phrases
accepted accordance actual additional Agreement AIA Document AIA General Conditions allow alternates amount Answer applicable appropriate approved archi architect ARCHITECTURAL LICENSE SEMINARS AREA base Bond budget building claims codes completion concrete Conditions considered construction cost consultants contract documents contractor correct cover damages described determine Division drawings effective electrical elements engineers equipment establish estimate example expensive factors final finish fire fixed limit floor forces incorrect installation Instructions to Bidders joints labor less liable liens materials mechanical ment METAL methods NAME necessary normally openings operating owner payment performance period prepare procedures proposal reduce responsible result roof schedule selected spaces specifications SQFT standard statements struction structural subcontractors submit substantial surfaces tion tractor trade unit usually walls