Annual Report FY ... of the Chief of Engineers on Civil Works ActivitiesThe Office, 1985 - Civil engineering |
From inside the book
Results 1-5 of 100
Page 3-11
... acre - feet at spillway crest level with 1,390 acre - feet of inactive storage , 39,830 acre - feet for water supply and recreation , and 27,030 acre - feet for flood control . The cost of project was $ 22,931,400 including $ 6,100,000 ...
... acre - feet at spillway crest level with 1,390 acre - feet of inactive storage , 39,830 acre - feet for water supply and recreation , and 27,030 acre - feet for flood control . The cost of project was $ 22,931,400 including $ 6,100,000 ...
Page 3-12
... acre - feet of inactive storage , 70,000 acre - feet for water supply and recreation and 108,000 acre - feet for flood control . Estimated Federal cost of new work ( October 1985 ) is $ 127,000,000 including $ 110,700,000 required non ...
... acre - feet of inactive storage , 70,000 acre - feet for water supply and recreation and 108,000 acre - feet for flood control . Estimated Federal cost of new work ( October 1985 ) is $ 127,000,000 including $ 110,700,000 required non ...
Page 3-13
... acre - feet formed by an earth embankment , about 1,225 feet long at crest and rising 109 feet above creek bed . It also has a tunnel with intake structure and a chute - type spillway with a stilling basin in left abutment . Reservoir ...
... acre - feet formed by an earth embankment , about 1,225 feet long at crest and rising 109 feet above creek bed . It also has a tunnel with intake structure and a chute - type spillway with a stilling basin in left abutment . Reservoir ...
Page 4-12
... feet of the bank behind the beachfill and con- structing four segments of offshore breakwater with es- timated ... acre - feet is provided . Storage available for low flow augmentation for water supply and water quality improvement is ...
... feet of the bank behind the beachfill and con- structing four segments of offshore breakwater with es- timated ... acre - feet is provided . Storage available for low flow augmentation for water supply and water quality improvement is ...
Page 4-13
... acre - feet equivalent to 5.1 inches of runoff from the drainage areas . The lake will extend about 4,600 feet and inundate 87 acres when filled to spillway crest . Recre- ation facilities constructed by local interest include a bathing ...
... acre - feet equivalent to 5.1 inches of runoff from the drainage areas . The lake will extend about 4,600 feet and inundate 87 acres when filled to spillway crest . Recre- ation facilities constructed by local interest include a bathing ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess 75th Cong acre-feet Annual Report Approp Arkansas River AUTHORIZING LEGISLATION bank Bayou Beach bridge Canal Chesapeake Bay Chief of Engineers City Condition at end construction contract contributed funds cooperation County Creek depth dike drainage dredging East end of fiscal Engineering and design Estimated cost Existing project extending Federal cost feet deep feet long Flood Control Act Fully complied Geological Survey map Harbor Act Includes Inlet Island jetty Lake Location Lock and Dam Maint mean low water Mississippi River Missouri River mouth navigation non-Federal Ohio River Ohio River Basin operation and maintenance Operations and results Operations during fiscal Port previous projects project provides Public Law recreation facilities relocations results during fiscal River and Harbor September 30 spillway storage Table Terminal facilities tion tributary Trinity River turning basin Wabash River water supply width