Management of Engineering Projects |
Contents
The Procurement Project Initiated | 6 |
Proposed System Design | 18 |
Estimating of Costs | 60 |
Copyright | |
9 other sections not shown
Other editions - View all
Common terms and phrases
acceptance accuracy achieve action activity addition amount analysis application areas award baseline basic changes characteristics clause complete components consideration considered contract contractor cost curve cycle decision delivery derived described design approach design engineer detail determine direct discussed documents drafting drawings effect effort Electronics elements equipment established estimate evaluation event existing experience factors failure Figure functions identified indicate instance involved Landmass Simulator major manufacturing material meet ment necessary negotiations noted objectives offeror operation organization particular parties percent performance period PERT phase possible presented problem procedures procurement production project engineer proposal radar reflect relating reliability represents requirements responsibility result schedule Shadow shown simulator specification standard subsystems Table task technical tests tion transparency usually various weeks XXX XXX XXX