Model Construction Specifications for Asphalt Concrete and Other Plant-mix Types |
From inside the book
10 pages matching contractor in this book
Page 51
Page 52
Where's the rest of this book?
Results 1-3 of 10
Common terms and phrases
3.11 ASPHALT-AGGREGATE MIXTURE 3.14 PREPARING 3.17 ACCEPTANCE REQUIREMENTS AASHTO Designation asphalt cement Asphalt Concrete asphalt content asphalt film Asphalt Institute asphalt mixture Asphalt Paving Manual asphalt paving mixes asphalt paving mixture Asphalt Plant-Mix asphaltic material ASTM Designation base and surface base course Coarse Aggregate compacted Concrete or Asphalt construction contractor control grading band course mixture criteria for test criteria when tested deleted density emulsified asphalt engineer equipment gal/yd² gradations hot-mix sand asphalt job control grading job-mix formula megagram Method of Test MINERAL AGGREGATE Mineral Filler mix design method paver Paving Manual MS-8 paving operation Percent Air Voids PETROLEUM placed pneumatic-tired PREPARING THE MIXTURE pugmill recommended sand asphalt base screen short ton Sieve Sieve Analysis Specification PM-1 Subgrade subsample surface course Table II-1 tack coat test criteria tested at 38°C thickness Total Mixture Total Percent Passing Traffic Analysis Vibratory Roller Viscosity Voids in Mineral weight percent XXXX