Page 12 - ... CE, examined the cable near one of the shoes, and found some of the wires corroded quite through. Further tests showed that the outer layer alone was affected, the second layer of wire being sound and bright. The evident cause of the corrosion was the elongation and contraction of the strands under passing loads, which had loosened the cement from the outside strands, allowing moisture to work in. The defective wires were cut out, and new ones spliced under strain, and attention was then directed...
Page 5 - The Re-Enforcement of the Anchorage and Renewal of the Suspended Superstructure of the Niagara Railroad Suspension Bridge.
Page 10 - After the plant had been in use for some time it was found that the temperature of the flue gases at the base of the chimney reached a maximum of 700 Fahr.
Page 23 - Tests. square inch of section, and an elastic limit of not less than half the tensile strength, with not less than 56 per cent of ductility, as indicated by contraction of area at point of fracture under test, and by an elongation of 25 per cent in a length of 8 inches.
Page 25 - At that time we had stripped the old bridge of all superfluous material, as cornices, the rails forming the broad gauge track, &c., in all decreasing the weight about 80 tons.
Page 22 - May 28th the bids were opened in the presence of the Board and the contract awarded to the Pittsburgh Bridge Co., that company being the lowest bidder.
Page 23 - It must have an ultimate tensile strength of at least 60,000 Ibs. per square inch of sectional area, and ah elastic limit of at least 25,000 Ibs.