Aquifer Testing: Design and Analysis of Pumping and Slug Tests, Part 1

Front Cover
CRC Press, May 31, 1991 - Technology & Engineering - 368 pages
0 Reviews
New! A practical, easy-to-use reference for the design and analysis of groundwater pumping and slug tests

Aquifer Testing: Design and Analysis of Pumping and Slug Tests is a complete design and analysis reference emphasizing practical solutions for engineers, scientists, consultants, and students knowledgeable in basic ground water theory. The book discusses such models as steady-state, transient flow with constant discharge, slug injection or withdrawal, and step discharge.

This valuable book is an expansion on our best seller Groundwater Pumping Tests: Design and Analysis (Walton 1987). Part I contains general information about pumping tests, including how to design a pumping test, select an appropriate model, correct data, and analyze results. Part II is devoted to aquifer models and features hydrogeologic conditions, flow and geometry assumptions, governing differential equations, initial and boundary conditions, and analytical solutions for different models. BASIC coding for computer programs from which type curves may be developed and drawdown predicted are included in an appendix and on diskettes included in the book.
  

What people are saying - Write a review

We haven't found any reviews in the usual places.

Contents

Preface
1
AQUIFER TEST DESIGN
13
Chapter3 CORRECTIONS TO DRAWDOWN DATA
43
ANALYSIS OF PUMPING TEST DATA
51
ANALYSIS OF STEP DISCHARGE PUMPING TESTS
73
AQUIFER MODELS
79
EQUILIBRIUM UNCONFINED
85
TRANSIENT CONFINED
91
TRANSIENT CONFINED FISSUREBLOCK
225
TRANSIENT CONFINED ANISOTROPIC
235
TRANSIENT UNDERGOING CONVERSION
245
TRANSIENT UNCONFINED ANISOTROPIC
257
TRANSIENT UNCONFINED PARTIAL
277
TRANSIENT UNCONFINED PARTIAL
285
TRANSIENT UNCONFINED PARTIAL
291
SLUG TEST CONFINED INFINITE OR SEMI
297

TRANSIENT CONFINED LEAKY
103
TRANSIENT CONFINED LEAKY AQUTTARD
129
TRANSIENT CONFINED PARTIAL PENETRATION
153
TRANSIENT CONFINED LEAKY PARTIAL
195
TRANSIENT CONFINED WELL STORAGE
203
TRANSIENT CONFINED LEAKY WELL
217
SLUG TEST UNCONFINED OR LEAKY
307
SLUG TEST CONFINED COMPRESSIBLE
317
APPENDICES
327
REFERENCES
333
Index
339
Copyright

Common terms and phrases

References to this book

All Book Search results »