Tylers Beach, Virginia, Dredged Material Plume Monitoring Project: 27 September to 4 October 1991Michelle M. Thevenot, Terri L. Prickett, Nicholas C. Kraus |
Other editions - View all
Common terms and phrases
0.0 FREQUENCY 0.001 PARTICLE DIAMETER 30 September acoustic data acoustic instruments acoustic surveys Appendix approximately automatic water sampler background monitoring backscatter BBADCP COARSEST CTD recorder Date EDT deg C Salinity density discharge point Distance dredged material placement dredged material plumes Dredging and Placement dredging operations E-W ft Eastern Daylight ebb tide EDT ft entrainment Equation field calibration fluid ft MLW GREATER THAN 0.074 James River laboratory calibration layer located Lynnhaven measurements MEDIAN mg/l were observed obtained October PHI SKEWNESS placement operations Plume Monitoring Point of Shoals pre-dredging Prickett profiles range relict channel Rescue Marina Salinometer Sample Station samples taken settling speed shear stress Sheet showed slack water speed and direction spreading Station Time Depth survey leg suspended material concentration Suspended Sediment Concentration Table B2 TBMP Temperature Salinity Thevenot throughout the water tidal transects transmissometer Tylers Beach U.S. Army Engineer underflow velocity vertical viscosity water column water samples