A Guide To Task Analysis: The Task Analysis Working GroupB Kirwan, L. K. Ainsworth This work shows readers how to target task analysis TA resources effectively over the life cycle of a project from conceptual design Through To Systems Operation, Noting The Role Of TA In Safety And Quality assurance, minimizing operator error, |
Contents
Introduction | 1 |
The task analysis process | 9 |
The task analysis process | 15 |
Introduction | 35 |
Task analysis case studies | 237 |
A staffing assessment for a local control room | 289 |
Task simulation to predict operator workload in a command system | 301 |
Analysis of operator safety actions | 311 |
Maintenance training | 327 |
A method for quantifying ultrasonic inspection effectiveness | 341 |
Operational safety review of a solid waste storage plant | 355 |
A task analysis programme for a large nuclear chemical plant | 363 |
Summary of task analysis techniques | 391 |
Glossary of Terms | 403 |
Acronyms | 409 |
Other editions - View all
A Guide To Task Analysis: The Task Analysis Working Group B Kirwan,L. K. Ainsworth Limited preview - 2003 |
A Guide To Task Analysis: The Task Analysis Working Group B Kirwan,L. K. Ainsworth Limited preview - 1992 |
A Guide To Task Analysis: The Task Analysis Working Group B Kirwan,L. K. Ainsworth Limited preview - 1992 |
Common terms and phrases
accident actions activities alarm application approach areas auxiliary feedwater behaviour carried CCTV checklist complete control room control stations critical incident critical incident technique cycle stage data collection defined detailed developed display drill Earliest life cycle effects ensure equipment ergonomics event tree example failure fault tree Fault tree analysis feedback Figure flow function hazards HAZOP hierarchical task analysis Human factors issues human reliability assessment identify influence diagram interface design interview investigation involved link analysis link diagrams monitoring MORT necessary Nuclear Nuclear Regulatory Commission observation operational sequence diagrams particular Performance assurance personnel Petri nets plant possible potential problems procedures programme questionnaire RACK recording respondent safety sampling scenario scenario analysis simulation specific Table task analysis methods task analysis techniques task decomposition task descriptions task elements timeline analysis tion town's water users valve verbal protocols walk-through Washington D.C. workload assessment


