Columbia River Between Mouth of Willamette River and Vancouver, Washington: Letter from the Secretary of the Army Transmitting a Letter from the Chief of Engineers, Department of the Army, Dated March 31, 1961, Submitting a Report, Together with Accompanying Papers and Illustrations, on an Interim Report on Columbia River ...1961 - Columbia River - 53 pages |
Common terms and phrases
300-foot channel 35 feet deep 74th Congress 800 feet wide adopted low water alumina aluminum annual benefits annual charges annually for maintenance basins 35 feet bauxite bridge at Vancouver bulk cement cargo channel 35 feet channel depths Chief of Engineers Columbia and Lower Columbia River commodities construction and $48,000 Corps of Engineers cubic yards Dalles deep and 500 District Engineer downstream existing project Federal Fisheries Hayden Island interests interim report Interstate Bridge Interstate highway bridge lower turning basin Lower Willamette Rivers lumber maintenance dredging mouth of Willamette Oreg Oregon Oregon and Washington Pittock Block plan of improvement port of Vancouver Portland project for Columbia proposed improvement public hearing recommended improvement River and Vancouver river mile River to Vancouver Rivers and Harbors shipment short loading short tons Snake River tons Transportation savings tributary area turning basins 35 types of vessels U. S. Army United upstream Wash waterway under consideration