DOE 2.1 Performance Simulation Method User's Documentation Method: 1985 Office StandardsCalifornia Energy Commission, 1984 - DOE 2.1 (Computer program) |
Common terms and phrases
1.000 CONSTRUCTION ABSORPTION CHILLER Accepted default value air film AREA AZIMUTH BASE FLOOR BASEBOARD HEAT BOILER building model Calculated from SUPPLY-DELTA-T CHILLER coefficient of performance COIL COIL CONDENSER TYPE CONSTANT CONSTANT-VOLUME CONSTRUCTION COMPONENTS CONTROL Selections COOL-CONTROL cooling cooling tower DAY-SCHEDULE describes the type Detailed Model DUCT CONTROL METHOD ELECTRIC Enter name ENTHALPY equipment used TYPE EXTERIOR WALL FACADE ASSIGNMENT FAN CONTROL Fan System FLOOR TYPE FURNACE EFFICIENCY GLASS TYPE GYPSUM HEATING ENERGY SOURCE HOT WATER Value HOT WATER/SOLAR HVAC input INSTALLED NUMBER MAX-SUPPLY-T Model Editor MULTIPLIER NIGHT CYCLE CONTROL OIL FURNACE option parent[1 PMZS Preprocessor Q(uit REHEAT REQUIRED RESET RETURN FAN SCHEDULED Section SETBACK Simple Model Definer space specified STAY-OFF SUPPLY STATIC SUPPLY-CFM SUPPLY-DELTA-T and SUPPLY-KM SUPPLY-EFF SUPPLY-STATIC supressed Surface Numbers SYSTEM TYPE SYSTEM-AIR SYSTEM-CONTROL SYSTEM-EQUIPMENT SYSTEM-FANS TEMP thermostat TILT TOWER TWO-SPEED TYPE describes type of equipment TYPE TYPE U-value User-name Variable Air Volume WINDOW X-COORDINATE Zone Numbers ZONE-NAMES