Equipment Improvement Report and Maintenance Digest, Test, Measurement and Diagnostic Equipment (TMDE), (third Quarter, CY 1985). |
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
17 June 28 June acceptance test procedures Acquisition Management Additional AIF activities analysis Appropriate Action approval Army August Authorization calibration CHAPTER commodity commands components contract contractor correct cost dates deleted depot determine developmental direct Discussion distributed effort Electronic engineering established failure fielding gaining command Group Highest identified indicated July June 1985 Change Lesson Learned Letter List logistics Maint Maintenance major major weapons system MICOM Million Model Number Obtaining Office operation performance PIL Item printing Problem Product Project Manager proposed Publications Reference Register repair replaceable report period Requests Requirements and Development specific standard TB 9 technical Tektronix TEMIS TEMOD test equipment TMDE Topic TPS Requirements TPS's transformer Type unit USACTA utilized Vacuum Pump X X X X X X X X X X XX XX X X