Hyperbaric Facilities |
Contents
39-161 | |
39-172 | |
39-196 | |
39-205 | |
39-219 | |
39-224 | |
39-225 | |
39-237 | |
39-94 | |
39-98 | |
39-105 | |
39-119 | |
39-123 | |
39-136 | |
39-147 | |
39-150 | |
39-153 | |
39-155 | |
39-245 | |
39-253 | |
39-256 | |
39-262 | |
39-265 | |
39-274 | |
39-280 | |
39-286 | |
39-287 | |
39-299 | |
Common terms and phrases
acrylic plastic Acrylic Windows Annealing ASME ASTM bolt breathing gas calculated carbon dioxide clamp Code compressed compressor configuration Conical Frustum Windows corrosion cylinder depth design pressure diameter diving Engineering equipment evaluated fabrication feet flange flow fluid foundation gasket geometry Hatch End hazard helium hyperbaric chamber hyperbaric facilities inches inside installed internal pressure loading material maximum stress intensity minimum Model NAVFAC NEOPRENE nozzle O-ring O-RING SEAL operation oxygen Paragraph partial pressure percent piping materials piping system Port Hueneme pressure drop Pressure Vessels procedure psia psig Recompression Chamber Reference reinforcement ring Schedule seat cavity seawater Section VIII shell short term critical shown in Figure soil specific spherical Stachiw STCP steel Stress Analysis stress concentration stress intensity limits Table temperature term critical pressures tions tubing U.S. Navy valve velocity Viewport Penetration wall thickness weld wet pot WINDOW DESIGN window seat