Spon's Civil Engineering and Highway Works Price Book 2014, Book 2014Davis Langdon Output in infrastructure is forecast to rise by 6.6% in 2013 & 7.6% in 2014, driven by Highways Agency's capital budget funding, by rail and by electricity Spon's Civil Engineering and Highway Works Price Book 2014 gives costs for both general and civil engineering works and highway works, and provides a full breakdown of labour, plant and mate |
Contents
GENERAL | 1 |
ON COSTS AND PROFIT | 47 |
COST AND TENDER PRICE INDICES | 53 |
RESOURCES | 59 |
APPROXIMATE ESTIMATING | 75 |
UNIT COSTS CIVIL ENGINEERING WORKS | 149 |
UNIT COSTS HIGHWAY WORKS | 365 |
DAYWORK | 505 |
Common terms and phrases
additional aggregate allowances angle average backfilling base beam brick thick brickwork building cement chamber channels charges CLASS coat complete concrete construction cont contract Contractor costs cover curved deep depth disposal double driven ducts Engineering equipment ESTIMATING excavation exceeding excluding Extra facing finish fixed floor frame Gang hours Labour grade ground height horizontal installation invert irons Item Gang hours joints kerb kg/m length lighting load m² m² m² mass Material Unit Total maximum metal mm dia mm thick nominal Note nr nr nr operative operator skill rate paving piles pipes plain Plant posts radius rails reference Road rock SERIES sheet sided single slab standard steel straight structures supply surfaces timber tonne trenches Unit Total rate vertical walls Website wide width