Standard Specifications for Highway Construction, January 1, 1968 |
Contents
GENERAL REQUIREMENTS AND COVENANTS | 1 |
1201 | 11 |
Award of Contract | 17 |
50 other sections not shown
Common terms and phrases
acceptable accordance additional aggregate amount applied approved Asphalt ASTM backfill bars base basis bituminous material bolts bridge casting cement cent Class coat compacted compensation completed concrete conform considered consist construction Contract Contractor costs course covers Cubic curing Department designated determined diameter dimensions directed edge elevation Engineer equipment excavation fabric feet final finished foot forms furnished grade holes inch indicated inspection installed Item joints least length less limits load locations manner measured meet ment metal method mixing mixture necessary operations otherwise paint pavement Payment performed permitted piles pipe placed placement Plans plant plates portion posts pounds prior produce Project Proposal quantity reinforcement removed road SAMPLING seal separate shown soil Special specified square standard steel strength structure sufficient surface temperature thickness timber tion uniform unit unless wearing course weight welding width wire Yard