Standard Specifications for Highway Construction, January 1, 1968 |
Contents
GENERAL REQUIREMENTS AND COVENANTS | 1 |
Bidding Requirements and Conditions | 11 |
Award of Contract | 17 |
2 other sections not shown
Common terms and phrases
AASHO acceptable accordance additional aggregate Aluminum applied approved Asphalt Asphaltic Concrete backfill base BASIS OF PAYMENT batch bituminous material bolts bridge calcium chloride casting cement cent coat cofferdam compacted compensation in full completed concrete conform Contract prices Contractor Cubic Yard culvert curing designated diameter dimensions embankment Engineer equipment excavation fabric falsework feet finished fog seal furnished galvanized girders grade haul holes inch inspection installed Item joints length less Linear Foot locations measured ment metal method minimum mixer mixing mixture mulch operations paint pavement permitted piles pipe placed placement Plans plant plates portland cement posts pounds prior Project quantity removed requirements of ASTM riprap rivets road Road Tar Roadbed roller SAMPLING AND TESTING SCOPE This Specification screed seal shown sieve Sieve Analysis soil Specification covers strength Structural Steel Subgrade surface temperature thickness timber tion traffic unit wearing course weight welding width wire