Annual Report FY ... of the Secretary of the Army on Civil Works ActivitiesDepartment of the Army, United States of America, 1992 - Civil engineering |
From inside the book
Results 1-5 of 100
Page 1-44
... September 30 , 1993 Island End River ,. 1964 TABLE 1 - C OTHER AUTHORIZED NAVIGATION PROJECTS Project Apponaug Cove , RI1 For Last Full Report See Annual Report for Operation and Maintenance 42,189 Contributed Funds Expended ...
... September 30 , 1993 Island End River ,. 1964 TABLE 1 - C OTHER AUTHORIZED NAVIGATION PROJECTS Project Apponaug Cove , RI1 For Last Full Report See Annual Report for Operation and Maintenance 42,189 Contributed Funds Expended ...
Page 2-3
... 30 percent of the cost of the program except as modified by 1962 River and Harbor Act and agree to hold the United ... September 30. Reconnaissance report cov- ering the aquatic plant problems of the North Atlantic Division areas was ...
... 30 percent of the cost of the program except as modified by 1962 River and Harbor Act and agree to hold the United ... September 30. Reconnaissance report cov- ering the aquatic plant problems of the North Atlantic Division areas was ...
Page 2-6
... September 30. Work under existing project began in July 1910 and was substantially completed in Novem- ber 1965. New lock and dam at Troy , removal of dam at Troy and construction of 15,545 linear feet of dikes also are com- plete . In ...
... September 30. Work under existing project began in July 1910 and was substantially completed in Novem- ber 1965. New lock and dam at Troy , removal of dam at Troy and construction of 15,545 linear feet of dikes also are com- plete . In ...
Page 2-7
... 30 May 1986. A supplemental agreement was executed on 21 May 1987 . Terminal facilities . See Port Series No. 5 , Vol . 2 . Operations and results during period , and condition as of Sept. 30. Stage 1 , channel deepening to 40 feet in ...
... 30 May 1986. A supplemental agreement was executed on 21 May 1987 . Terminal facilities . See Port Series No. 5 , Vol . 2 . Operations and results during period , and condition as of Sept. 30. Stage 1 , channel deepening to 40 feet in ...
Page 2-8
... September 30. Work under existing project was commenced March 1967 and physically completed June 1967 . 11. NARROWS OF LAKE CHAMPLAIN , NY & VT Location . This waterway . 37 miles long , comprises south- ern end of Lake Champlain and ...
... September 30. Work under existing project was commenced March 1967 and physically completed June 1967 . 11. NARROWS OF LAKE CHAMPLAIN , NY & VT Location . This waterway . 37 miles long , comprises south- ern end of Lake Champlain and ...
Other editions - View all
Common terms and phrases
1st sess 2d sess acre-feet Annual Report Approp authorizing legislation Bayou breakwater Bridge Canal Chief of Engineers Condition at end Cong construction contract contributed funds cooperation County Creek deauthorized deepening depth District drainage dredging easements east end of fiscal Engineering and design entrance channel estimated Existing project Federal cost feet deep feet long Flood Control Act Fully complied Harbor Act Includes Inlet Island jetty Lake Levee Location Lock and Dam Maint mean low water miles Mississippi River mouth Nautical Chart navigation NOAA Nautical Chart non-Federal Ohio River Ohio River Basin operation and maintenance Operations and results Operations during fiscal piers previous projects project dimensions project was completed Public Law reservoir Resources Development Act results during fiscal River and Harbor Section September 30 spillway Table Terminal facilities Text Total cost turning basin upstream Wabash River Water Resources Development Waterway