Annual Report of the Board of Water Commissioners of the Domestic Water Works System of the City of Los Angeles, for the Fiscal Year Ending November 30, ..., Volumes 1-10 |
Common terms and phrases
acre feet Alameda Angeles River average Balance December basin Board of Water boilers Bonds Buena Vista Pumping Buena Vista Reservoir capacity cent City Water Coastal Plain Compton Ave conduit Construction consumption cost Crystal Springs Deposits Returned discharge Downey Ave East Edendale elevation Elysian Elysian Park ending Nov ending November 30 engine estimated Figueroa St Figueroa street Fire Hydrants flow gallons daily Garvanza gravel Hoover Infiltration Gallery installed Interest and Sinking irrigation Ivanhoe Reservoir July Kern River L. A. Aqueduct Length inches feet Location Los Angeles River Los Feliz Maintenance Material purchased million gallons mountain Mulholland Ninth North November 15 November 30 Operating Owens River Pasadena Pico PIPE LAID Pumping Plant pumping station rainfall San Fernando Valley San Gabriel San Gabriel River San Pedro St Santa second feet Sixth Slauson South Park stream Street Mains Sundries Total Tunnel Vermont Ave Water Commissioners Water Department water supply West Zanjas