Means Unit Price Estimating Methods: Standards & Procedures for Using Unit Price Cost DataExplains and demonstrates the methods and procedures of Unit Price Estimating, from the plans and specifications to the estimate summary. Special Features: -- Fully updated sample estimate by MasterFormat division -- Discussion of computerized estimating methods -- Companion guide to Means Building Construction Cost Data |
Contents
I | 10 |
BEFORE STARTING THE ESTIMATE | 13 |
THE QUANTITY TAKEOFF | 21 |
Copyright | |
10 other sections not shown
Common terms and phrases
1993 BARE COSTS Allowance Separate Contract Aluminum Appendix B Figure ARCHITECT Average Beams board foot Brick Building Construction Cost Ceiling Column CONSOLIDATED ESTIMATE PROJECT Construction Cost Data contractor COST TOTAL COST CREW OUTPUT HOURS determine diameter drywall Electrical Elevator EQUIPMENT COST excavation Fiberglass Finish fixtures Floor Formwork Frames Galvanized steel Grade Gypsum HVAC included installation Insulation Joists LABOR EQUIPMENT LOCATION Man-Hours Masonry MasterFormat Maximum Means Building Construction Metal minimum Office Building OUTPUT HOURS UNIT Panels Partitions percentage Pipe Plaster Plywood project overhead quantity takeoff rates Reinforcing Roof Rowlock Sales Tax schedule SFCA shown in Figure Slab Soffits specifications spreadsheet sprinklers square foot Stainless Steel story Structural Steel SUBCONTRACT COST TOTAL subcontractor Subtotals Terrazzo thick Tile TOTAL COST TOTAL TOTAL INCL O&P UNIT COST TOTAL Vapor Barrier Wall Weight wood studs Yes Allowance Separate Yes Describe