Page 115
The bridge , looking west . Five beams are in position in the longer span and one beam in the shorter . The track on which the beams were moved across the bridge from the casting area can be seen in the foreground The completed bridge ...
The bridge , looking west . Five beams are in position in the longer span and one beam in the shorter . The track on which the beams were moved across the bridge from the casting area can be seen in the foreground The completed bridge ...
Page 229
... bridge and slightly tilted the whole superstructure about the hinges without causing any cracks . By means of horizontal jack- ing the bridge was reinstated in the perpendicular position . By a for- tuitous set of chances the design of ...
... bridge and slightly tilted the whole superstructure about the hinges without causing any cracks . By means of horizontal jack- ing the bridge was reinstated in the perpendicular position . By a for- tuitous set of chances the design of ...
Page 240
... bridge , constructed in 1858 , which had long proved an obstruction to traffic in this area , as it had only one roadway 8 ft . 9 ins . wide , flanked on each side by a footway 4 ft . 6 ins . wide . The swing bridge had also been ...
... bridge , constructed in 1858 , which had long proved an obstruction to traffic in this area , as it had only one roadway 8 ft . 9 ins . wide , flanked on each side by a footway 4 ft . 6 ins . wide . The swing bridge had also been ...
Other editions - View all
Common terms and phrases
accept the tender aggregate amounting approximately average base beams bills of quantities binder bituminous borough engineer bridge British Standards capacity carpet carriageway carried cement cent Committee recommends compaction concrete construction of roads contractors Corporation cost crete diesel directors engi engineer and surveyor equipment exhibited Federation of Malaya finisher Form of tender George Wimpey gravel Highway Engineers housing estate hydraulic improvement Institution intersections kerb laid Lane load London macadam machine maintenance ment methods miles Ministry of Transport mixer mixing motor obtained operation plans plant Portland cement prestressed prestressed concrete recommends the acceptance reinforced road construction Road Research Laboratory road surface Road Tar roads and sewers rolled asphalt roller sand screed slab soil specification speed steel struction subgrade superelevation supply surface dressing tarmacadam tests thickness tion tons tractor traffic unit vehicles width