| Geology - 1896 - 758 pages
...Lake Calumet and the other small lakes as its dwarfed representatives. The beachlets stand only 10 to 12 feet above lake level (except where coated by...leading from the south part of Hyde Park Township northwestward between Englewood and South Lynne, which connects with the south fork of the Chicago... | |
| United States. District Court. Illinois (Northern District). - 1914 - 684 pages
...told the Government Engineers that were stationed here. Q. The project providing for the improvement of the Chicago River and the South Branch of the Chicago River is practically completed? A. It is. Q. Except in some small stretches? A. Some small stretches. Q.... | |
| Chicago Sanitary District - Chicago (Ill.) - 1919 - 276 pages
...have been operated as provided by the Sanitary District Law unless the west fork of the south branch of the Chicago River and the South Branch of the Chicago River were improved so that the channel of such rivers would be enlarged sufficiently to permit the passage... | |
| Administrative law - 1999 - 660 pages
...December 1 through March 31, the draws of the highway bridges across the Chicago River, the North Branch of the Chicago River, and the South Branch of the Chicago River need open on signal only if at least 48 hours notice is given. However, the bridges need not open during... | |
| Administrative law - 2000 - 716 pages
...December 1 through March 31, the draws of the highway bridges across the Chicago River, the North Branch of the Chicago River, and the South Branch of the Chicago River need open on signal only if at least 48 hours notice is given. However, the bridges need not open during... | |
| Administrative law - 2001 - 660 pages
...December 1 through March 31, the draws of the highway bridges across the Chicago River, the North Branch of the Chicago River, and the South Branch of the Chicago River need open on signal only if at least 48 hours notice is given. However, the bridges need not open during... | |
| Pilot guides - 1996 - 464 pages
...December 1 through March 3 1 , the draws of the highway bridges across the Chicago River, the North Branch of the Chicago River, and the South Branch of the Chicago River need open on signal only if at least 48 hours notice is given. However, the bridges need not open during... | |
| Pilot guides - 1999 - 452 pages
...December 1 through March 3 1 , the draws of the highway bridges across the Chicago River, the North Branch of the Chicago River, and the South Branch of the Chicago River need open on signal only if at least 48 hours notice is given. However, the bridges need not open during... | |
| |