Urban Construction Project Management (McGraw-Hill Construction Series)• The authors are both established figures in the urban construction field • The book will help contractors keep projects on time and within budget |
From inside the book
Results 1-2 of 2
Page x
... Storage 143 Off-Site Storage 143 On-Site General Storage 143 Dumpsters 144 Storage of Gas Cylinders and Other Hazardous Materials 145 Required Permits 145 Moratoriums 146 Signage 147 Sidewalk Bridges, Sheds, and Fencing 149 Security 150 ...
... Storage 143 Off-Site Storage 143 On-Site General Storage 143 Dumpsters 144 Storage of Gas Cylinders and Other Hazardous Materials 145 Required Permits 145 Moratoriums 146 Signage 147 Sidewalk Bridges, Sheds, and Fencing 149 Security 150 ...
Page 15
... storage, staging, clean up, power, and water. Timekeeper The timekeeper is responsible for the logging of all Project Organization 15 Assistant Superintendent (AS) Mechanical, Electrical, Plumbing, Sprinkler (MEPS) Engineer Project ...
... storage, staging, clean up, power, and water. Timekeeper The timekeeper is responsible for the logging of all Project Organization 15 Assistant Superintendent (AS) Mechanical, Electrical, Plumbing, Sprinkler (MEPS) Engineer Project ...
Contents
1 | |
21 | |
35 | |
4 Building Codes and Permits | 61 |
5 Safety | 73 |
6 Logistics | 117 |
7 Layouts and Surveying | 165 |
8 Drawings and Specifications | 177 |
15 Schedules | 287 |
16 Subcontractors and Bidding | 309 |
17 Costs | 331 |
18 Claims and Dispute Resolutions | 363 |
19 DesignBuild | 371 |
20 Requisitions | 381 |
21 Project Punch List and Closeout | 399 |
22 Technology | 411 |
9 Contracts | 189 |
10 Insurance and Bonds | 207 |
11 Security | 227 |
12 Renovation and Demolition | 235 |
13 Meetings and Communications | 245 |
14 Project Documentation Logs and Reports | 263 |
23 Green Construction | 423 |
Epilogue | 431 |
References | 435 |
Index | 439 |
Other editions - View all
Urban Construction Project Management (McGraw-Hill Construction Series) Richard Lambeck,John Eschemuller No preview available - 2008 |
Common terms and phrases
Allow approved architect asbestos bond budget Building Department certificate change order Chapter Check checklist CM/GC complete concrete construction documents construction industry construction process construction project Construction Specification Institute contract contractor coordination coverage crane curtain wall Date design team design-build determine developed drawings electrical elevation ensure equipment evaluate excavation Exhibit field office fire floor flowchart formwork hoist home office HVAC included included included inspections installed labor load long lead items meeting Obligee obtain OSHA owner owner’s payment perform personnel phase pipes plumbing potential preconstruction project manager pump punch list reinforcing steel requisition responsible Review risk management risk management plan safety sample schedule shanties shop drawings sidewalk bridge specifications sprinkler storage structure subcontractor submitted surety surety bond surveyor Temporary testing track trades truck urban environment usually utilized value engineering waiver of lien workers