Open Shop Building Construction Cost DataR.S. Means Company, 1998 - Building |
Other editions - View all
Common terms and phrases
031 CONCRETE FORMWORK 032 CONCRETE REINFORCEMENT 095 ACOUSTICAL TREATMENT 096 FLOORING 099 PAINTING 1-16 WEIGHTED AVERAGE 1998 BARE COSTS aluminum BARE COSTS TOTAL brick capacity Carp CAST IN PLACE Clab coat COSTS TOTAL CREW COSTS TOTAL MAT crane CREW OUTPUT HOURS Daily Costs O&P Daily Hr DAILY LABOR Daily Totals deep diameter division DOORS & WINDOWS Elec excavation fiberglass FLOORING & CARPET frame gallon galv Galvanized haul HOURS UNIT MAT INST installation insulation LABOR EQUIP TOTAL Labor-Hour MASONRY MC cable MECHANICAL 16 ELECTRICAL Metal minimum Maximum MOISTURE PROTECTION Oper OUTPUT HOURS UNIT PAINTING & WALL panels pipe PLACE CONCRETE PLASTER & GYPSUM Pord pump roof slab span Stainless steel THERMAL & MOISTURE thick TOTAL CREW OUTPUT TOTAL DIV TOTAL INCL 0&P TREATMENT & WOOD Truck type NM cable WALL COVERINGS wellpoint wide wire WOOD & PLASTICS WOOD FLOORING