Unit Price Estimating Methods |
Contents
Square Foot and Cubic Foot Estimates | 3 |
BEFORE STARTING THE ESTIMATE | 13 |
THE QUANTITY TAKEOFF | 21 |
Copyright | |
8 other sections not shown
Other editions - View all
Common terms and phrases
2002 BARE COSTS Allowance Separate Contract Aluminum Appendix B Figure ARCHITECT Average Beams Bond Brick Building Construction Cost Ceiling Column Construction Cost Data contractor COST TOTAL COST CREW OUTPUT HOURS determine diameter drywall Electrical Elevator excavation Fiberglass Finish fire doors fixtures Floor Formwork Frames GHI SUBCONTRACT TOTAL Grade Gypsum Historical Cost HOURS UNIT MAT HVAC included installation insulation Jan-02 CHECKED Joists LABOR EQUIP Masonry MasterFormat material Maximum Means Building Construction Metal method minimum OUTPUT HOURS UNIT Partitions percentage Pipe Plaster Plywood project overhead quantity takeoff rates Reinforcing Roof Sales Tax schedule SFCA shown in Figure Slab specifications spreadsheet sprinklers square foot Stainless Steel Stairs story Structural Steel SUBCONTRACT TOTAL COST subcontractor Subtotals Terrazzo thick Tile TOTAL COST TOTAL UNIT COST TOTAL Unit Price Estimating vapor barrier Wall weight wood studs Yes Allowance Separate Yes Describe