Means Systems CostsMeans, 1985 - Building |
Common terms and phrases
12 perlite 12 polystyrene additional floor Alum aluminum amperes arm brackets BACKUP beams block 10 perlite block 10 polystyrene block 12 Block Wall brick butt welded 8-3/4 C.Y. bucket columns conc conduit copper Copper tubing COST EACH INST COST PER S.F. deck deep diam diameter drywall K.D. end bearing exterior fiber fiberglass finish fixtures footcandles frame Friction type galvanized glass gypsum heat HP motor incl included INST TOTAL MAT insulation Joists L.W. block LOAD P.S.F. masonry MAT INST TOTAL Maximum metal minimum panels pile cluster pipe plaster 2 coat Plumbing Precast QUANTITY UNIT MAT REINF Reinforced ribbed risers Roof S.F. bldg S.F. INST S.F. MAT S.F. Type schedule 40 solder span Sprinkler styrofoam System Components SYSTEM Table thick tile TOTAL LOAD TOTAL MAT INST Valve water closet watt wide wire Wrought copper