Erecting and Installation Work: A Practical Guide in the Erection and Installation of Machines and Structures on SiteEdward Molloy |
Contents
INSTALLATION OF I C ENGINES | 32 |
INSTALLATION OF BOILERS | 57 |
STEAMENGINE ALIGNMENT 123 | 73 |
Copyright | |
4 other sections not shown
Other editions - View all
Erecting and Installation Work: A Practical Guide in the Erection and ... Edward Molloy No preview available - 1942 |
Common terms and phrases
adjustment air cylinder alignment amount angles anvil block back end bedplate black bolts bolt holes bottom brackets brass bricks brickwork bushes carried cement centre line clearance connecting rod correct cotter crank crankshaft diameter distance drill driven shaft edges employed engine ensure erection faces feeler gauge firebrick fitted fixed flanges flexible coupling flywheel foundation bolts front end gauge gear girder grouting hammer holding-down bolts horizontal installation joists Lancashire boiler large-end bearing length lifting lifting jack lineshaft lowered machine mal-alignment measurements method Metropolitan-Vickers motor moved necessary nuts packing pipe piston placed plate plummer blocks position possible pulley pump reamers rear end remove roller rope round Ruston & Hornsby screw shows side flues slide slide-rails sole-plate spirit level steam steel straight-edge stud taken tank tested thickness tightened timber traversing jack valve vertical vibration wall wedges weight wheel wire wood