Third International Conference on Installation Engineering: Designing and Maintaining Successful Systems, 7-8 June, 1988, Issues 287-289 |
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Electrical installation in a 3km long cable tunnel in Hong Kong | 8 |
Selecting standby generating plants for buildings | 18 |
An alternative approach to the design of standby power systems | 28 |
Copyright | |
63 other sections not shown
Common terms and phrases
achieved addition allow applications breakdown building cable cause changes channel characteristics charge circuit communication complete conductor connected considered cost depending developed device dielectric distribution earth effect electrical electrode equipment example existing facilities factor fault field Figure fire floor frame function important increase initial installation insulation integrated interface ISDN layer lighting limited load locations materials maximum means measured mechanism method node normal occur offered operation performance positive possible present private network problems protection protocol range RCDs REFERENCES relay response sample shown shows signalling standard strength supply surface switching Table temperature terminal traffic transmission tunnel typical voice voltage wiring