Developments at the Consett Works of the Consett Iron Company, Limited |
Contents
The Duplex Steelmaking Process by W E Ward | 1 |
Operational Experiences with the SlabbingBlooming and Continuous Billet | 7 |
Some Aspects of Electrical Maintenance by R Mathieson | 15 |
3 other sections not shown
Common terms and phrases
arrangement auxiliary Bessemer converter Bessemer plant blast-furnace blower blown metal boiler bottom brake bridge British Railways building bunkers busbar cables capacity carried charge coal coke-oven Commission Consett Iron Company construction contactor continuous billet mill converter conveyors cost Coxon crane discharge Dock plant drive duplex process efficiency electrical equipment erection fault feeders finishing mill ft./min fuel handling heat hopper increased ingots installed Isolating Jarrow load machine maintenance material ment motor open-hearth furnace operation ore-handling plants overhaul Peech and Tozer permit-to-work card power station reclaiming rectifiers roll roller tables roughing mill scrap Scunthorpe ships sinter sinter plant slabbing and blooming slabbing mill slabbing/blooming mill slag soaking pits speed steam steelworks substation supply swarf switchgear tare tonnage tons tons/hr train transfer table trouble turbine turbo-blowers Tyne Dock Tyne Improvement Commission Valve wagons Ward-Leonard control