Facility Allocation Project1962 - Materials handling - 66 pages |
Contents
EARLY APPROACH AND RESULTS | 2 |
DEVELOPMENT OF AN APPROXIMATE METHOD | 6 |
FLOW CHART OF RANDOM INPUT GENERATION | 9 |
6 other sections not shown
Common terms and phrases
APPROXIMATE METHOD Assignment Problems ASSIGNMENT SUM ASSIGNMENT BASE PAIR SWITCHING best assignment best feasible solution best sum Original Burroughs 220 check matrix cells D cell Ernest E facilities the percentage feasible assignments five facility test FLOW CHART INITIALIZE four facility problem four machine Industrial Engineering iterative program iterative results Journal of Industrial loading the check Location Pairs Distance lower sum Machine paths materials handling cost MAX BEST SUM McGraw Hill Modified and Original MODIFIED AS BASE Muther number of examinations number of valid ORIG Original and Modified ORIGINAL AS BASE ORIGINAL MODIFIED SUM ORIGINAL SUM output pair matrix resulted PAIR SWITCHING MODIFIED PAIR SWITCHING ORIGINAL percent deviation Plant Layout procedure Program as input PROGRAM FLOW CHART program was written project group says assign six facility problems six facility test six facility trial solutions per trial SUM ASSIGNMENT ASSIGN SUM ASSIGNMENT SUM SUMX valid solutions W₁(I Wimmert WORST ORIGINAL