John Christian. Construction Costs Optimum Cost Accelerated Program Contract Time Figure 4.4 Time - cost optimization . Normal Program Late Program Overall Cost Indirect cost Direct Cost 6. Cost of other facilities 7 . Insurance 8. Cost ...
John Christian. Construction Costs Optimum Cost Accelerated Program Contract Time Figure 4.4 Time - cost optimization . Normal Program Late Program Overall Cost Indirect cost Direct Cost 6. Cost of other facilities 7 . Insurance 8. Cost ...
Page 215
... COSTS Ownership costs include the cost of depreciation , interest , taxes , insur- ance , and storage . These are generally considered as fixed costs which the owner must pay and are not directly related to the annual utiliza- tion of ...
... COSTS Ownership costs include the cost of depreciation , interest , taxes , insur- ance , and storage . These are generally considered as fixed costs which the owner must pay and are not directly related to the annual utiliza- tion of ...
Page 217
... cost fuel consumption / hr x cost / liter = 50 liters × 0.30 $ 15.00 The service cost includes oil , grease , and labor and may be assumed to be one third of the fuel cost for a medium duty cycle . Service cost = = 15 $ 5.00 Cutting edge ...
... cost fuel consumption / hr x cost / liter = 50 liters × 0.30 $ 15.00 The service cost includes oil , grease , and labor and may be assumed to be one third of the fuel cost for a medium duty cycle . Service cost = = 15 $ 5.00 Cutting edge ...
Contents
SCOPE OF CONSTRUCTION ORGANIZATION | 24 |
PLANNING PROGRAMMING AND PROGRESS | 41 |
PROJECT APPRAISAL | 67 |
Copyright | |
11 other sections not shown
Other editions - View all
Common terms and phrases
activities amount Answer assumed base bucket calculated capacity civil engineering compaction completed concrete considered construction contract contractor cost Courtesy crane cutting cycle depends depreciation depth determine distance driving effective England equipment estimated Example excavation face factor fixed flow formwork given ground haul head important increase interest kN/m² length less limit lining load machine manager material maximum method moving necessary obtained operation organization owner particular pile placed planning Plate position possible pressure prevent production pumps range reduced Refer resistance road rock roller sand scaffolding scraper sheet shown in Figure shows soil specifications speed standard steel stresses structure suitable surface Table timber tion tire truck tunnel unit usually various vary vibrating volume wall weight wheel