A Report to the Wisconsin State Board of Health on the Proposed Water Works for Greendale, Wisconsin |
Common terms and phrases
36 grains aerator Apple Court artesian Capita Daily Consumption centrifugal pump City of Milwaukee connection to smaller COST OF WATER Cross connection deep well turbine diameter mains Distribution System Ditto Dogwood St Domestic supply E.School St elevated tank End of Street ESTIMATED COST Feeder main fire flow g.p.m. fire streams gallons per minute grains per gallon Grange Ave Greendale Ground Storage Tank hardness Hemlock St Hill St housing units hydrant iron oxide Lake Geneva lime soda-ash Lineal ft linear foot located Maple St Maximum Hourly Consumption Meters Milwaukee County North Rd North Road End number of 250 Oconomowoc pipe Platteville Probable Water Consumption pump will pump pump with electric pumping capacity pumping station S.Alder St settling basin Simon sandstone smaller mains Sturgeon Bay Sycamore St thesis Total turbine pump University of Wisconsin Unnamed st Valley St Valves Velocity Walnut St Water Services WATER WORKS SYSTEM Wauwatosa West Allis Wisconsin Rapids