Locks and Builders Hardware: A Hand Book for Architects |
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Locks and Builders Hardware: A Hand Book for Architects (Classic Reprint) Henry Robinson Towne No preview available - 2017 |
Locks and Builders Hardware: A Hand Book for Architects (Classic Reprint) Henry Robinson Towne No preview available - 2017 |
Common terms and phrases
applied Appropriate Finishes architect artistic Backset bolt Brass Bronze Buffed Builders buildings Butts cast Cluny Colonial combined construction Copper CX22 Cup Escutcheons Cuts Cylinder decoration Design Door Locks Door Pulls Drawer Pulls effect Escutcheon Plates examples Explanation of Finish Extension fastening Finish Symbols Flush Sash Lifts French Front give given Gold Hand Handles Hardware Hinge illustrated inches including Esc'n Plates indicate inside Iron FX80 Italian Italy Key Plates Latch latter less Lever lock Lock-sets Manufacturing Master-keyed metal Metals and Finishes Method of Pricing Mortise Mult'r Nomenclature Note operated opposite original ornament pair pieces Plain Plates and Knobs Push Buttons Push Plates Renaissance Reversible Romanesque selection shown shows Shutter side Silver Silver SX52 Size sliding spring steel Store Door Handles Strike style surface Trim tumblers usually various wrought Yale Lock
Popular passages
Page 1002 - ... the expense incurred by the Owner in finishing the work, such excess shall be paid by the Owner to the Contractor ; but if such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the Owner . The expense incurred by the Owner as herein provided, either for furnishing materials or for finishing the work, and any damage incurred through such default, shall be audited and certified by the Architect, whose certificate thereof shall be conclusive upon the parties.
Page 1007 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work with promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architect, the Owner shall be at liberty, after three days...
Page 1001 - It is also understood and agreed by and between the parties hereto that such additional drawings and explanations as may be necessary to detail and illustrate the work to be done are to be furnished by said Architect, and they agree to conform to and abide by the same so far as they may be consistent with the purpose and intent of the original drawings and specifications referred to in Art.
Page 1002 - ... under this contract, of all materials, tools, and appliances thereon, and to employ any other person or persons to finish the work, and to provide the materials therefor; and in case of such discontinuance of the employment of the...
Page 89 - And the key of the house of David will I lay upon his shoulder; so he shall open, and none shall shut; and he shall shut, and none shall open.
Page 1001 - No alterations shall be made in the work except upon written order of the Architect ; the amount to be paid by the Owner or allowed by the Contractor by virtue of such alterations to be stated in said order.
Page 1001 - II. It is understood and agreed by and between the parties hereto that the work included in this contract is to be done under the direction of the said Architect, and that his decision as to the true construction and meaning of the drawings and specifications shall be final.
Page 1002 - Contractor , then the time herein fixed for the completion of the work shall be extended for a period equivalent to the time lost by reason of any or all...
Page 1001 - ... decision as to the true construction and meaning of the drawings and specifications shall be final. It is also understood and agreed by and between the parties hereto that such additional drawings and explanations as may be necessary to detail and illustrate the work to be done...
Page 1002 - The Contractor shall complete the several portions, and the whole of the work comprehended in this agreement by and at the time or times hereinafter stated provided that ART.