Papers Presented at the Fourth Australian Tunnelling Conference, March 1981 |
Contents
Preface | 1 |
The engineering task J W Connell | 13 |
Project management procedures adopted for control of the M C Healy | 29 |
Copyright | |
30 other sections not shown
Common terms and phrases
adit adjacent ANFO Australia basalt beam Bernold blastholes blasting bolts booking halls box tunnel building burn cut cable cement centre charges Clifton Hill colluvium compressed concourse concrete construction contract contractor crown pillar cutter depth diameter disc dowels drilling Elizabeth Street Engineer equipment escalators excavation extensometers face Figure fill Flagstaff Station Flinders Street Station geological ground grout holes horizontal hydraulic installed invert joints jumbo load located Long Tunnel machine Melbourne Underground Rail methods metres METROL mining modulus monitoring muck mudstone Museum Station operation orebody panel parent tunnel Parliament Station piles platform portal road header rock mass rockbolts running tunnels shaft shear shield shotcrete siltstone Silurian slab steel ribs stope Street tunnel stress structure struts surface Tamala Limestone tests tonnes track tunnel boring machine tunnel lining Underground Rail Loop vertical Victorian Railways wall weathered Zone